Main Article Content

Muhammad Nur Sahid
Anto Budi Listyawan
Abdul Rochman
Rim Dzaky Haidar Rim

Abstract

The implementation of the road project in Wonogiri Regency was often different between the planning with has be held that making problem for contractor like as late work and cost overrun. Therefore, the purpose of this research is knowing what is cost overrun factors and also amount of cost overruns of the road project in Wonogiri Regency which used APBD 2017 and 2018 experienced by contractor. This research was conducted by asking questions to the contractor who worked on the road project in 2017 and 2018. The analysis of this research has using the SPSS program. Based on the analysis has been done, field regulation become dominant of cost overrun. The lack of provision of field support facilities and the limited size of the project area are the reasons why field regulation factors can be a major factor causing cost overruns on road projects in Wonogiri Regency. Based on the answers from respondents it can be concluded that the contractors who experienced a swelling cost of 1% -5% there were 44 respondents, then for the cost swelling of 6% -10% there were 28 respondents, and 11% -15% there were 2 respondents, and 16% -20% only 1 respondent.

Downloads

Download data is not yet available.

Article Details

How to Cite
Sahid, M. N., Listyawan, A. B., Rochman, A., & Rim, R. D. H. (2020). Analisis Faktor Dominan yang Mengakibatkan Pembengkakan Biaya oleh Kontraktor pada Proyek Jalan Kabupaten Wonogiri APBD Tahun 2017 dan 2018. Cantilever: Jurnal Penelitian Dan Kajian Bidang Teknik Sipil, 8(2), 51-57. https://doi.org/10.35139/cantilever.v8i2.8
References
Ahmad, Z., B. Anigbogu, N. A., & Molwus, J. J. (2018). Peculiarities of Road Projects Cost Overruns. International Journal of Scientific and Engineering Research, 9(6), 121-124.
Algifari (2000). Analisis Regresi (Edisi 2). Yogyakarta: BPFE.
Davidson, J. (2002). Manajemen Proyek. Yogyakarta: Andi.
Dipohusodo, I. (1996). Manajemen Proyek dan Konstruksi. Yogyakarta: Kanisius.
Ervianto, W. I. (2002). Manajemen Proyek Konstruksi. Yogyakarta: Andi Offset.
Love, P. E. D., Sing, M. C. P., Carey, B., & Kim, J. T. (2015). Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects. American Society of Civil Engineers, 04014035, 1-10.
Priyastama, R. (2017). Buku Sakti Kuasai SPSS. Yogyakarta: Start Up.
Ramdani, D. (2013). Analisis Faktor Penyebab Pembengkakan Biaya (Cost Overrun) pada Proyek Konstruksi Tugas Akhir Yogyakarta: Fakultas Teknik, Universitas Atma Jaya.
Sahid, M. N. (2017). Teknik Pelaksanaan Konstruksi Bangunan. Surakarta: Muhammadiyah University Press.
Soeharto, I. (1997). Manajemen Proyek dari Konseptual sampai Operasional. Jakarta: Erlangga.
Sujarweni, V. W. (2014). Metode Penelitian: Lengkap, Praktis, dan Mudah Dipahami. Yogyakarta: Pustaka Baru Press.
Venkateswaran, C. B. & Rajiah M. (2017). Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India, Journal of Construction in Developing Countries, 22(1), 79-96).